| Execution Time |
from: 11/2012
to: 11/2013 |
| Execution Stage |
Lump Sum Turn Key
|
| Client | ČESKÁ RAFINÉRSKÁ, a.s. |
These projects allowed to operate the FCC unit without the VDU unit in the long term of operation. The project was executed during a shutdown of the refinery.