COKE AND TAR REMOVAL PACKAGE FROM QUENCH WATER IN ETHYLENE PLANT

Execution Time from: 09/2022
to: 04/2024
Execution Stage
Packaged unit
Client JGC-KIEWIT JOIN VENTURE c/o KIEWIT ENERGY GROUP, Inc.
 

The principle of the technological process is the separation of coke solid particles by mechanical filtration in special process filters with a unique washing process in order to achieve a loose and dry form of coke particles. This patented process of the system has been developed and is owned by Intecha (process technology).

The scope was design and procurement of a Coke and Tar Removal Package (CTRP) from the quench water loop at the ethylene plant (EP).  The CTRP removed coke without any necessity for shutdown of the quench water loop, with no negative impact to the environment and to health and safety.

 

The inlet stream of quench water with coke particles enters special process filters, where the coke is filtered in periodic operation and, using a unique washing technology, dry and loose coke is obtained, which is then transported for disposal.

The installation of a CTRP increases the efficiency of the EP, extends the service life of the equipment, and at the same time reduces operating costs and environmental pollution. The integration of this technology enables ethylene units to switch to a multi-year shutdown cycle.

 

In order to minimize the amount of assembly work at the customer's site, shorten the construction time, and ensure high quality, a strategy of manufacturing a modular CTRP unit was chosen.

 

The entire CTRP unit was completey manufactured and tested at the manufacturer's production facilities in the Czech Republic, then disassembled into three compact modules (two filter modules and one staircase module) and handed over for transport.

The performance of all assembly work (equipment, steel structure, piping, insulation, instrumentation, electrical) at the production plant in the Czech Republic also reduces implementation costs and increases work safety and quality.