References – Petrochemical industry

ETHYLENE PLANT EXPANSION

The project presented an increase in the capacity from the existing 453 000 t/year to 560 000 t/year of ethylene production.

 

BENZENE LOADING STATION RECONSTRUCTION

The principal objective of the project was to decrease the emissions of hydrocarbons from storage tanks and from the loading station of benzene, pyrolysis oil, fuel oil, gas oil and C9 fraction.

 

SELECTIVE REMOVAL OF H2S FROM CO2 OFF-GAS

The reconstruction of two process lines of the "Gasification of the heavy fuel oil" production unit was based on gradual reconstruction of both process lines of the "process gas wash" without any shut down of the production.

 

STYREN PRODUCTION UNIT

Construction of a new unit for the production of styrene with a capacity of 130 000 tons of styrene–monomer per year.

 

FLARE LIQUID SEAL

To connect off-gas from the new production plant, Styrene Plant, a liquid seal was installed in the inlet line to the existing flare stack as a flame arrestor feature and to catch condensate from the offgas.

 

FLARE RECONSTRUCTION – STYRENE PLANT

To treat off-gas from the new production plant Styrene existing flare was reconstructed in order to achieve a total capacity to 118 t/h of flare gas and a smokeless capacity 34 t/h and to decrease the consumption of utilities simultaneously.

 

FLARE RECONSTRUCTION – ETHYLENE PLANT

Reconstruction of the flare system of ethylene unit and storages with a capacity of 150 t/h of flare for smokeless combustion.

 

COKE REMOVAL FROM QUENCH OIL SYSTEM IN ETHYLENE PLANT

Design and implementation of the filtration unit in the quench oil loop in order to remove solid coke particles without any shut down period of ethylene production.

 

ISOMERIZATION OF C5/C6 FRACTION

Construction of a new unit of Isomerization of C5/C6 fraction according to a process by UOP–PENEX with an annual capacity 170 kt and construction of a new unit of redistillation of the reformate with a capacity of 270 kt/year.

 

C3 CUT SELECTIVE HYDROGENATION

We implemented a new unit based on a licensed process of IFP company to the existing ethylene plant.