Design and procurement of The Coke Removal Unit (CRU) for the quench oil loop.
Design and procurement of The Coke Removal Unit (CRU) for the quench oil loop.
A project for pneumatic conveying of crystalline urea in the granulation tower – the off-gas contained solid particles of urea and free ammonia in an amount exceeding the emission limits.
Feasibility study of the Coke Removal Unit (CRU) application for the quench oil loop.
Design of the process and execution of the entire project including all the associated modification and changes of the ethylene plant, storage and the rail tank cars loading station.
Replacement and reconstruction of pressure reducing stations for high pressure steam for a capacity of 200 t/h approximately and parameters p=11.9 MPa; t=520 0C, including the associated piping connections.
Replacement of the steam turbine of the charge gas compressor, the steam turbine of the propylene compressor and the steam turbine of the ethylene compressor belonged to a project called „Increasing the capacity of the ethylene plant" in CHEMOPETROL, a.s. Litvínov.
A new flare system for new production units PE and PP and for other existing units was designed within the project.
The main objective of the reconstruction of the “POX” unit of "Gasification of heavy fuel oil".
The objective of the reconstruction of the unit "Gasification of heavy fuel oil" was to carry it out without any shut down of the production unit, gradual reconstruction of both process lines of HTS conversion was executed.