LIMIT VALVES AT UNDERGROUND GAS STORAGE (UGS) FACILITY DOLNI DUNAJOVICE, UGS TVRDONICE, UGS LOBODICE

Execution Time from: 2012
to: 2013
Execution Stage
Detail Design
Client RWE Gas Storage, s. r. o.
 

Safely isolation of technology in each underground gas storage from the transit gas pipeline.

Installation of limit valves was one of the conclusions of a safety study and a HAZOP.

The project found a location, where to install those valves and designed their connection to the control system of the UGS.