Execution Time |
from: 2013
to: 2019 |
Execution Stage |
Study
Basic Design
Documentation for Planning Permit
Documentation for Building Permit
Detail Design
|
Client | innogy Gas Storage, s.r.o. |
The aim of this project was to ensure safe emergency depressurization of the pressure technology in case of emergency situation in underground gas storage area.
The project followed a Feasibility Study and Safety Study by HAZOP method, which were also prepared by Intecha.
This project designed a completely new system of emergency depressurization mainly based on the standards EN ISO 23251, API 521 and EN 1473, including piping, vent stacks and a safety control system.
The project also included the replacement of valves on the piping area and replacement of drives for electro fittings.