Storages, Loading and Unloading, VRU, ATD

RECONSTRUCTION OF UNLOADING RAILWAY STATION

Intecha finalized the concept of the process with giving the consequent functional guarantee of the entire system.

 

RECONSTRUCTION OF GASOLINE REFINING UNIT

Reconstruction included modification of the existing storage tanks, procurement of new pumps and piping connections in the scope of the mechanical part of the project. Intecha was also responsible for all the civil, electrical and instrumentation parts of the project.

 

UNLOADING STATION RECONSTRUCTION

Reconstruction of the unloading station featured reconstruction of the existing unloading station to comply with the legislation of environmental protection, to improve safety, and to increase options of its use simultaneously.

 

BENZENE LOADING STATION RECONSTRUCTION

The principal objective of the project was to decrease the emissions of hydrocarbons from storage tanks and from the loading station of benzene, pyrolysis oil, fuel oil, gas oil and C9 fraction.

 

CHEMICALS UNLOADING AND STORAGE FOR WATER TREATMENT PLANT

The project solved an unacceptable state of the unloading of chemicals for chemical treatment of water from rail tank cars and its storage.

 

RECUPERATION OF REFINERY OFF-GAS - VRU UNIT

Design and construction of a complete system of vapors collection from storage tanks, loading of tank trucks and rail tank cars including safety valves, and detonation flame arresters.