FLARE RECONSTRUCTION – STYRENE PLANT

Execution Time from: 1998
to: 1998
Execution Stage
Documentation for Building Permit
Detail Design
Lump Sum Turn Key
Client Kaučuk, a.s.
 

To treat off-gas from the new production plant Styrene existing flare was reconstructed in order to achieve a total capacity to 118 t/h of flare gas and a smokeless capacity 34 t/h and to decrease the consumption of utilities simultaneously.

The objective of the project was to replace the flare tip including a molecular seal, to install a new steam piping including a supporting steel structure and to install new instrumentation and a control system for smoke automatic control of the flare.